In September 2019 we put a deposit down on a lot in Del Webb at Grande Dunes Myrtle Beach, SC and signed the contract in October. The builder broke ground the last week in November with an estimated completion date of 20 March 2020 and true to their word we closed on 20 March. We loaded out in Tyro, NC on 31 March and unloaded in Myrtle Beach, SC on 1 April 2020 despite the Covid-19. Takes more than a pandemic to stop Diane.